La Canada Drive Road Widening: Client-Town of Oro Valley
The scope of our work was:
* Earthwork Grading - Widen La Canada Dr. from Naranja Drive to Tangerine Road * Storm Water Pollution Control/Maintenance * Storm Water Drainage System * Soil Nail Retaining Walls * Curbing & Sidewalk * Asphalt Paving
Project Manager Brett Fischer. Project Engineer Jeff Kurtin. Project Superintendent Mike Mc Daniel.
Utility Foreman Henry Larson. Concrete Structure Foreman Bill Wright and Freddie Molina. Asphalt Foreman Julio Santa Cruz.
______________________________________________
Honea Heights Improvements: Client-Town of Marana
This project was three different projects in one. In Honea Heights neighborhood we had to replace an existing 4" water main in an alley and regrade and pave the streets. The third was a 8" water main connecting two water systems together.
The scope of our work was:
* 2" Bypass Water System * 4" Water Main Replacement * Header Curb * Grade and Pave Existing Streets * 8" Sewer Line with Four House Services * 8" PVC Water Main
Project Manager Terry Marshall. Project Engineer Travis Whelan. Project Superintendent Tony Strom & Bobby Darby. Utility Foreman Henry Larson. Concrete Foreman Freddie Molina. Asphalt Foreman Julio Santa Cruz.
______________________________________________
Fort Huachuca FY07 Military Family Housing: Client-Sundt
The scope of our work was:
* Curbing & Sidewalk Scuppers * Asphalt Paving
Project Manager Allen Sheppard. Project Engineer Travis Whelan. Project Superintendent Rick Cornelius & Bobby Darby.
Concrete Foremen are Bill Wright doing structures and Freddie Molina running the curb and sidewalk. Asphalt Foreman Julio Santa Cruz.
______________________________________________
Fort Huachuca: Client-US Army
NAC Construction has a 5 year Job Order Contract. Currently we are working on JITC West Parking Lot, the culverts on East Range, Rugge Hamilton Sidewalks, Rugge Hamilton Paving, Rebuild Greely Hall lots, Reconfigure East Gate, Motorcycle Parking at Rugge Hamilton, Main Post Chapel Lots and Reconfigure Main Gate.
The scope of our work was:
* Earthwork Grading * Storm Water Pollution Control/Maintenance * Storm Water Drainage System * Curbing & Sidewalk * Asphalt Removal & Paving
Project Manager Brett Fischer. Project Engineer Travis Whelan. Project Superintendent Bobby Darby. Field Superintendent Tony Strom.
Concrete Foremen are Bill Wright doing structures and Freddie Molina running the curb and sidewalk. Asphalt Foreman Julio Santa Cruz.
______________________________________________
The Pines II Subdivision: Client-Standard Pacific Homes
The Pines II is located in Tucson. This project is a 265 lot single family home subdivision.
The scope of our work was:
* Earthwork Grading - 150,000 CY Import * Storm Water Pollution Control/Maintenance * Storm Water Drainage System * All Underground Utilities * Curbing, Sidewalk & Concrete Box Culverts * Asphalt Paving
Project Manager Allen Sheppard. Project Engineer Jeff Kurtin. Project Superintendent Mike McDaniel & Jesse Pantoja. Underground Foreman Henry Larson.
Concrete Foremen are Bill Wright doing structures and Freddie Molina running the curb and sidewalk. Asphalt Foreman Julio Santa Cruz.
______________________________________________
Fourth Ave Underpass: Client-Sundt for City of Tucson
NAC Construction was a subcontractor of Sundt. Sundt rebuilt the 4th Avenue Underpass and several connecting streets.
The scope of our work was:
* Relocating Existing Water System * Sewer Main * Storm Drain
Project Manager Allen Sheppard. Project Engineer Travis Whelan. Project Superintendent Andy Cota.
Concrete Foreman's are Bill Wright doing structures and Freddie Molina running the curb and sidewalk. Asphalt Foreman Julio Santa Cruz.
______________________________________________
Bonita Creek Fish Barrier: Client-Bureau of Reclamation
The scope of our work was:
* 1 Colored 180' Fish Barrier. * Storm Water Pollution Control/Maintenance.
Project Manager Brett Fischer. Project Engineer Dave Kay, Jr.. Project Superintendent Tony Strom.
Concrete Structure Foreman Bill Wright
______________________________________________
Multi Use Path Canada Del Oro Wash: Client-Town of Oro Valley
The scope of our work was:
* Earthwork Grading * Storm Water Pollution Control/Maintenance * 3 Pedestrian Bridges * Soil Cement Bank Protection * Curbing * Asphalt Paved Path
Project Manager Brett Fischer. Project Engineer Jeff Kurtin. Project Superintendent Cory Hejl.
Concrete Structure Foremen Bill Wright and Freddie Molina running the curb and sidewalk. Asphalt Foreman Julio Santa Cruz.
______________________________________________
Multi Use Path Sierra Vista: Client-ADOT
The scope of our work was:
* Earthwork Grading * Storm Water Pollution Control/Maintenance * Storm Water Drainage System * Curbing & Sidewalk * Asphalt Paving
Project Manager Brett Fischer. Project Superintendent Jesse Pantoja.
______________________________________________
Sonora Estates II Subdivision: Client-Sierra Pacific Homes
Sonora Estates II is located in SW Tucson. This project was a 140 lot single family home subdivision.
The scope of our work was:
* Earthwork Grading * Storm Water Pollution Control/Maintenance * All Underground Utilities * Curbing & Sidewalk * Asphalt Paving
Project Manager Allen Sheppard. Project Superintendent Dick Morin & Jesse Pantoja.
Concrete Foremen are Bill Wright doing structures and Freddie Molina running the curb and sidewalk. Asphalt Foreman Julio Santa Cruz.
______________________________________________
Andrada Ranch Subdivision: Client-Sierra Pacific Homes
Andrada Ranch is located by Vail. This project is a single family home subdivision.
The scope of our work was:
* Earthwork Grading * Storm Water Pollution Control/Maintenance * All Underground Utilities * Curbing, Sidewalk & Box Culverts * Asphalt Paving
Project Manager Allen Sheppard. Utility Foreman Robert Vanzzini.
______________________________________________
Star Valley Block 18 Subdivision: Client-Standard Pacific Homes
This project is a 285 lot single family home subdivision.
The scope of our work was:
* Earthwork Grading * Storm Water Pollution Control/Maintenance * Storm Water Drainage System * All Underground Utilities * Curbing & Sidewalk * Asphalt Paving
Project Manager Terry Marshall. Project Superintendent Mike McDaniel. Utility Foreman John Trojanovich,
Concrete Foreman Freddie Molina. Asphalt Foreman Rick Purdon.
______________________________________________
Star Valley Block 2 Subdivision: Client-Standard Pacific Homes
This project is a 220 lot single family home subdivision.
The scope of our work was:
* Earthwork Grading * Storm Water Pollution Control/Maintenance * Storm Water Drainage System * All Underground Utilities * Curbing & Sidewalk * Asphalt Paving
Project Manager Terry Marshall. Project Superintendent Mike McDaniel. Utility Foreman Chuck Thompson.
Concrete Foreman Freddie Molina. Asphalt Foreman Rick Purdon.
______________________________________________
Fossil Creek Fish Barrier: Client-Bureau of Reclamation
The native fish restoration project involves the Tonto and Coconino National Forests and the Bureau of Reclamation. NAC Construction installed 2-4' natural looking fish barriers and 1 natural looking gabion dam. A few of the challenges were all of the items used to build and live at the site had to be flown in and out by helicopter. There was colored concrete placements. The helicopter was not allowed to land at the creek site. To redirect the flow of the creek we used rubber coffer dams. It was a 1.7 mile rough hike in and out. The site was secured 7 days a week.
The scope of our work was:
* 2 colored and textured fish barriers. * 1 covered gabion flood control structure. * Storm Water Pollution Control/Maintenance. * Live at site to strict Forest Bureau of Reclamation standards. * Use different routes in and out to protect native plants. * Helicopter materials to and from site.
Project Manager Allen Sheppard. Project Superintendent/Survival Specialist Dave Kay Jr.
Concrete Foreman Rudy Otero.
______________________________________________
Davis-Monthan Air Force Base Site "B" Housing: Client-Sundt Construction for the Army Corp of Engineers
This project was to build a cul-de-sac for six houses. This was a fast track job schedule.
The scope of our work was:
* 6 House Pads * 1 Asphalt Cul-de-sac * Storm Water Pollution Control/Maintenance * 24" Storm Drain with 3 Headwalls * Underground Utilities * Import Borrow Material to Fill Pads to Grade * Concrete Curb, Scuppers and Walkway
Project Manager Terry Marshall. Project Superintendent Tony Strom. Utility Foreman Robert Vanzzini.
Concrete Superintendent Bob Miller. Asphalt Superintendent George Figeroa.
______________________________________________
Sanitary Sewer Repair: Client-Davis-Monthan Air Force Base
This project upgraded exist sanitary sewer lines on the base.
The scope of our work was:
* Chemically Reline Existing Sanitary Sewer Lines * Rebuild Existing Manholes
Project Manager D. Allen Sheppard. Project Superintendent Robert Vanzzini.
______________________________________________
Camino Miramonte 48" Storm Drain: Client-City of Tucson
This project was a 48" reinforced concrete pipe storm drain just north of El Con Mall.
The scope of our work was:
* 1700 LF of 48" Reinforced Concrete Pipe * 1 Full Street Width Inlet Structure * Storm Water Pollution Control/Maintenance * Residential Water & Sewer Service Upgrades * Curbing, Driveway * Asphalt Paving
Project Manager Terry Marshall. Project Superintendent Bob Tibbs. Concrete Superintendent Bob Miller.
Asphalt Superintendent George Figeroa.
______________________________________________
Civano ll Subdivision: Client-Pulte Homes
Civano ll is located at Houghton Road and Bilby Road. This project is a 193 lot single family home subdivision. The Civano community is a nationally recognized environmentally sensitive Traditional Neighborhood Development in Tucson, Arizona.
The scope of our work was:
* Earthwork Grading * Storm Water Pollution Control/Maintenance
Project Manager Karter Kay. Project Superintendent Dick Morin. Field Superintendents Andy Cota & Robert Vanzzini.
Concrete Superintendent Bob Miller. Asphalt Superintendent George Figeroa.
______________________________________________
Sonora Subdivision: Client-Pulte Homes
Sonora is located in Rancho Sahuarita. This project is a 1100 lot single family home subdivision.
The scope of our work was:
* Earthwork Grading * Storm Water Pollution Control/Maintenance * Storm Water Drainage System * All Underground Utilities * Curbing, Sidewalk & Stamped Decorative Concrete * Asphalt Paving
Project Manager Karter Kay. Project Superintendent Dick Morin. Field Superintendents Andy Cota & Robert Vanzzini.
Concrete Superintendent Bob Miller. Asphalt Superintendent George Figeroa.
______________________________________________
Popup Barriers: Client-Davis-Monthan Air Force Base
This project was to secure the 3 entrances to DMAFB.
The scope of our work was:
* Install remote controlled Pop Up Barriers capable of stopping large trucks * Remote controlled Tiger Teeth Stop Strips * Several hundred tons of very large boulders * Warning signals * Curbing * Roadway widening asphalt paving
Project Manager D. Allen Sheppard. Project Superintendent Tony Strom. Concrete Superintendent Bob Miller.
Asphalt Superintendent George Figeroa.
______________________________________________
Julian Ranch West Subdivision: Client-KB Home
We have built all 4 phases of this single family housing project.
The scope of our work was:
* Earthwork Grading * Storm Water Pollution Control/Maintenance * Storm Water Drainage System * All Underground Utilities * Curbing & Sidewalk * Asphalt Paving * Multi-Use Path
Project Manager Karter Kay. Project Superintendent Bob Tibbs. Field Superintendent Chuck Thomson.
Concrete Superintendent Bob Miller. Asphalt Superintendent George Figeroa.
______________________________________________
Pantano Wash Park Improvement: Client-City of Tucson
This project is a small river front park.
The scope of our work was:
* Earthwork Grading * Storm Water Pollution Control/Maintenance * Cast-in-Place Concrete Retaining Walls * Colored Concrete Seat Wall * Exposed Aggregate Concrete Walkways * Asphalt & Decomposed Granite Multi-Use Paths * Landscaping
Project Manager D. Allen Sheppard. Project Superintendent Tony Strom. Concrete Superintendent Bob Miller.
Asphalt Superintendent George Figeroa.
|