Speedway Blvd: Camino Seco to Houghton Improvements

The scope of our work is:

*  Concrete Curbs
*  Asphalt Paving
*  Sidewalks
*  Bike Lanes
*  Drainage Improvements
*  New Traffic Signals
*  Landscaping
*  Street Lighting

______________________________________________

Camino del Cerro: Client-City of Tucson

The scope of our work is:

*  Add Turn Lanes
*  Lower Existing Roadway
*  Drainage Improvements
*  From I-10 to Silverbell

______________________________________________

Fort Huachuca: Client-US Army

NAC Construction has a 5 year Job Order Contract. Currently we are working on the PX Parking lot and Squire Ave.

The scope of our work is:                                                                                            

*  Earthwork Grading
*  Storm Water Pollution Control/Maintenance
*  Curbing & Sidewalk
*  Asphalt Removal & Paving

Project Manager Brett Fischer. Project Engineer Travis Whelan. Project Superintendent Tony Strom. Field Superintendent David Kay Jr.

______________________________________________

Grant Rd. & Craycroft Rd. Intersection: Client-City of Tucson

The scope of our work is:                                                                                            

*  Earthwork Grading - Widen the intersection to 2 turn lanes all directions
*  Storm Water Pollution Control/Maintenance
*  Modify Storm Water Drainage System
*  Modify Potable Water System
*  Modify Sanitary Sewer System
*  Demo & Install a 4 Barrel Box Culvert across Craycroft Rd.
*  Curbing & Sidewalk
*  Asphalt Paving
*  New Signal And Street Lighting

Project Manager Brett Fischer. Project Engineer Jeff Kurtin. Project Superintendent Mike Mc Daniel.

Utility Foreman Andy Cota. Concrete Foreman Ruben Martinez. Asphalt Foreman Julio Santa Cruz.

______________________________________________

Popup Barriers: Client-Davis-Monthan Air Force Base

This project is to add additional Popup Barriers to the outbound lanes at the 3 entrances to DMAFB.

The scope of our work is:

*  Install remote controlled  Popup Barriers capable of stopping large trucks
*  Remote controlled Tiger Teeth Stop Strips
*  Several hundred tons of very large boulders
*  Warning signals
*  Curbing
*  Roadway widening and asphalt paving

Project Manager D. Allen Sheppard. Project Engineer Travis Whelan. Project Superintendent TBA. Concrete Foreman TBA.

Asphalt Foreman Julio Santa Cruz.

 
 
     
 